Sand Control
Case History : Overcoming Sand Control Challenges in a Mature Offshore Field

Introduction
NEXUS OFS was engaged to provide an engineering support for the well completion of a mature offshore well facing sand production challenges. The well was located in a brownfield environment.
Background
- Location: Confidential
- Field type: Offshore brownfield, with UCS between 200psi-400psi, sandstone reservoir
- Well type: Highly deviated oil producer
- Objective: Analyze failure mechanism and provide robust solution for sidetrack well
Solution
- After detailed analysis of the formation sand, reservoir paraments and completion design, it was proposed to install sand control technique to minimize production of formation sand.
- Formation samples very deeply analyzed to ensure scalability across the field.
- Different techniques used to find out the optimal screen and gravel sizing.
Results
- Sand production significantly reduced
- Oil production rate increased by 114%